MODELS and MOULDS - Cost efficiency on schedule
 |
| The train's equipment room, an approximately 2-meter high ensemble constructed with several laminated materials, must withstand an acceleration of 5 Gs and a specified impact load. The construction complies with fire safety regulation UIC 564 for railway construction as well as sound insulation requirements. |
The right solution is created during the planning stage. Our expertise, backed up by the industry's most up-to-date planning technologies, covers 3D design, computer modelling, FEM strength analysis and prototype manufacturing.
Our grasp of the overall planning process brings speed, efficiency and flexibility to our projects. And most importantly, the process results in a product that satisfies our customers' requirements. Because our designers also understand manufacturing processes, the product can be made cost-effectively and delivered within the agreed time schedule.
|
|
| We model and manufacture structural ensembles. Modelling is done by computer, while models and moulds are made manually or with milling machines. |
|